[1] M.F. Diab, A. Varma, and K. Nassar, Using risk assessment to improve highway construction project performance, Proc. 48th ASC Annu. Int. Conf., Birmingham City University, Birmingham, UK, 2 (2012), no. 1, 11–14.
[2] C. Fang, F. Marle, E. Zio, and J.-C. Bocquet, Network theory-based analysis of risk interactions in large engineering projects, Reliab. Eng. Syst. Saf. 106 (2012), 1–10.
[3] B. Gladysz, D. Skorupka, D. Kuchta, and A. Duchaczek, Project risk time management-a proposed model and a case study in the construction industry, Procedia Comput. Sci. 64 (2015), 24–31.
[4] L. Guan, Q. Liu, A. Abbasi, and M.J. Ryan, Developing a comprehensive risk assessment model based on fuzzy Bayesian belief network (FBBN), J. Civ. Eng. Manag. 26 (2020), no. 7, 614–634.
[5] M. Iranian and J. Rezaeian, Risk assessment in road construction projects based on the PMBOK standard: A case study of the cable-stayed bridge construction project in Sari County, 11th Int. Proj. Manag. Conf. 11 (2018), 55–66.
[6] M.S. Islam, M.P. Nepal, and M. Skitmore, Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects, J. Constr. Eng. Manag. 145 (2019), no. 2, 04018126.
[7] S. Karimi and P. Piroozfar, Exploring causes of delays in national road and highway projects in developing construction economy, J. Eng. Proj. Prod. Manag. 12 (2022), no. 2, 137.
[8] D. Kefallinos, M.A. Lambrou, and E.D. Sykas, A multi-level relational risk assessment model for secure e-government projects, in Applied Technology Integration in Governmental Organizations: New E-Government Research, IGI Global Scientific Publishing, 2011, 153–181.
[9] K. Khair, Z. Mohamed, R. Mohammad, H. Farouk, and M. Elhadi Ahmed, A management framework to reduce delays in road construction projects in Sudan, Arab. J. Sci. Eng. 43 (2018), no. 4, 1925–1940.
[10] L. Khalaf, A. Leccadito, and G. Urga, Multilevel and tail risk management, J. Financ. Econ. 20 (2022), no. 5, 839–874.
[11] L.M. Khodeir and M. Nabawy, Identifying key risks in infrastructure projects-Case study of Cairo Festival City project in Egypt, Ain Shams Eng. J. 10 (2019), no. 3, 613–621.
[12] D.M. Kullaya, M.K. Alemu, and C.H. Yeom, An analysis of the main causes of delays in the completion of road construction projects: A case study of Tanzania, Open Transp. J. 16 (2022), no. 1.
[13] R.T.D.O. Lacerda, L. Ensslin, and S.R. Ensslin, Uma analise bibliometrica da literatura sobre estrategia e avaliacao de desempenho, Gest. Prod. 19 (2012), 59–78.
[14] I. Mahamid, Risk matrix for factors affecting time delay in road construction projects: Owners' perspective, Eng. Constr. Archit. Manag. 18 (2011), no. 6, 609–617.
[15] G. Mejia, O. Sanchez, K. Castaneda, and E. Pellicer, Delay causes in road infrastructure projects in developing countries, Rev. Constr. 19 (2020), no. 2, 220–234.
[16] A. Moghayedi and A. Windapo, Key uncertainty events impacting on the completion time of highway construction projects, Front. Eng. Manag. 6 (2019), no. 2, 275–298.
[17] R. Mohajeri Borje Ghaleh, T. Pourrostam, N. Mansour Sharifloo, J. Majrouhi Sardroud, and E. Safa, Reviewing causes of delay from the risk management perspective in execution stage in road construction projects (case study: Garmsar-Simin Dasht road), Civ. Infrastruct. Res. 5 (2020), no. 2, 69–82.
[18] R. Mohajeri Borje Ghaleh, T. Pourrostam, N. Mansour Sharifloo, J. Majrouhi Sardroud, and E. Safa, Delays in the road construction projects from risk management perspective, Infrastructures 6 (2021), no. 9, 135.
[19] S.M. Mousavi, R. Tavakkoli-Moghaddam, A. Azaron, S.M.H. Mojtahedi, and H. Hashemi, Risk assessment for highway projects using jackknife technique, Expert Syst. Appl. 38 (2011), no. 5, 5514–5524.
[20] A. Okate and V. Kakade, Risk management in road construction projects: High volume roads, Proc. Sustainable Infrastructure Development & Management (SIDM), 2019.
[21] S.M. Oluwajana, J.E. Ukoje, S.E. Okosun, and I.O. Aje, Factors affecting time and cost performance of road construction projects in Nigeria, Afr. J. Appl. Res. 8 (2022), no. 1, 72–84.
[22] R. Osei-Kyei, T. Narbaev, and G. Ampratwum, A scientometric analysis of studies on risk management in construction projects, Buildings 12 (2022), no. 9, 1342.
[23] L. Rivera, H. Baguec Jr., and C. Yeom, A study on causes of delay in road construction projects across 25 developing countries, Infrastructures 5 (2020), no. 10, 84.
[24] M. Seid, S. Devadoss, and G. Fekadu, Risk management practices in road construction projects, IOSR J. Bus. Manag. (IOSR-JBM) 21 (2019), no. 11, 43–53.
[25] A. Tawalare, Identification of risks for Indian highway construction, IOP Conf. Ser.: Mater. Sci. Eng. 471 (2019), no. 10, 102003.
[26] R. Zandi Doulabi and A. Amirkardoost, Identifying and prioritizing the factors affecting safety, health and environment in construction projects using multi-criteria decision-making technique, Civ. Proj. 4 (2022), no. 3, 26–42.