[1] S. Abhishek and S.A. Kumar, A study of research methodology on analysis of overrun factors with specific reference to marine construction projects, 2nd Int. Conf. Emerg. Trends Engin. Technol. sci. Manag., 2017, pp. 132–137.
[2] A.Q. Adeleke, A.Y. Bahaudin, A.M. Kamaruddeen, J.A. Bamgbade, M.G. Salimon, M.W.A. Khan, and S. Sorooshian, The influence of organizational external factors on construction risk management among Nigerian construction companies, Safety Health Work 9 (2018), no. 1, 115–124.
[3] D. Arditi, S. Nayak, and A. Damci, Effect of organizational culture on delay in construction, Int. J. Project Manag. 35 (2017), no. 2, 136–147.
[4] S. Aris, B. Aeini, and S. Nosrati, A digital aesthetics? Artificial intelligence and the future of the art, J. Cyberspace Stud. 7 (2023), no. 2, 219–236.
[5] R. Baradaran Kazemzadeh and S.M. Sharif Musavi, Presenting a fuzzy risk assessment model for evaluating the temporal risk of civil projects: the case of rehabilitating the railway line of the technical buildings of the Islamic Republic of Iran railways, Manag. Res. Iran 15 (2014), no. 1, 109–133.
[6] A. Burr, F. Barber, S. Briggs, W. Breyer, J. Castellano, D.-J. Gibbs, W. MacLaughlin, C. Miers, R. Palles-Clark, and K. Pickavance, Delay and disruption in construction contracts, Informa Law from Routledge, 2016.
[7] B. Dary and A. Hamzei, Determination of risk response strategy in risk management using ANP technique (case study: Azadegan north oil field development project), Ind. Manag. J. 2 (2010), no. 4, 75–92.
[8] J.L. Deng, Control problems of grey systems, Sys. Contr. Lett. 1 (1982), no. 5, 288–294.
[9] H. Doloi, A. Sawhney, K.C. Iyer, and S. Rentala, Analysing factors affecting delays in Indian construction projects, Int. J. Project Manag. 30 (2012), no. 4, 479–489.
[10] A. Dziadosz and M. Rejment, Risk analysis in construction project-chosen methods, Proc. Eng. 122 (2015), 258–265.
[11] G. Fern´andez-S´anchez and F. Rodriguez-L´opez, A methodology to identify sustainability indicators in construction project management—Application to infrastructure projects in Spain, Ecolog. Indic. 10 (2010), no. 6, 1193–1201.
[12] P. Heyrani and A. Baghaei, Risk assessment of oil and gas pipeline based on fuzzy Bow-Tie method, Health Safety Work 6 (2016), no. 1, 59–70.
[13] H. Hosseini, T. Dana, R. Arjmandi and I. Shirianpour, Environmental risk management For construction phase of oil fields platforms (Case study: Construction phase of Reshadat oil field), Human Envir. 10 (2012), no. 22, 33–53.
[14] S. Huang, X. Li, and Y. Wang, A new model of geo-environmental impact assessment of mining: a multiple[1]criteria assessment method integrating fuzzy-AHP with fuzzy synthetic ranking, Envir. Earth Sci. 66 (2012), no. 1, 275–284.
[15] H. Jalalvand and M. Mohammadizadeh, Ranking safety risk challenges in projects of the southern governorates of Sistan and Baluchestan province, Third Nat. Conf. Crisis Manag. Safety Health Envir. Sustain. Dev., 2017.
[16] G.K. Koulinas, P.K. Marhavilas, O.E. Demesouka, A.P. Vavatsikos, and D.E. Koulouriotis, Risk analysis and assessment in the worksites using the fuzzy-analytical hierarchy process and a quantitative technique–A case study for the Greek construction sector, Safety Sci. 112 (2019), 96–104.
[17] M.S. Kuo and G.S. Liang, Combining VIKOR with GRA techniques to evaluate service quality of airports under fuzzy environment, Expert Syst. Appl. 38 (2011), no. 3, 1304–1312.
[18] C.H. Lawshe, A quantitative approach to content validity 1, Person. Psych. 28 (1975), no. 4, 563–575.
[19] S. Malmasi, R. Arjomandi, R. Nezakati, and Z. Elah Dad, Using the ELECTRE method in assessing the environmental risks of Dam construction projects, Envir. Sci. Technol. J. 18 (2016), no. 4, 57–72.
[20] S.M. Mousavi, A multi-criteria decision-making approach with interval numbers for evaluating project risk responses, Int. J. Eng. 25 (2012), no. 2, 121–130.
[21] A. Nieto-Morote and F. Ruz-Vila, A fuzzy approach to construction project risk assessment, Int. J. Project Manag. 29 (2011), no. 2, 220–231.
[22] S. Nosrati, M. Sabzali, A. Arsalani, M. Darvishi and S. Aris, Partner choices in the age of social media: are there significant relationships between following influencers on Instagram and partner choice criteria?, Rev. Gestao Secret. (Manag. Admin. Profess. Rev.) 14 (2023), no. 10, 19191–19210.
[23] S. Nosrati, M. Sarfi, and M. Moosavand, Liquid love and continuation of a new love order, Synesis 16 (2024), no. 1, 114–132.
[24] S. Opricovic, Multicriteria optimization of civil engineering systems, Faculty Civil Engin. Belgrade 2 (1998), no. 1, 5–21.
[25] J. Rezaei, Best-worst multi-criteria decision-making method, Omega 53 (2015), 49–57.
[26] J. Rezaei, Best-worst multi-criteria decision-making method: Some properties and a linear model, Omega 64 (2016), 126–130.
[27] V.W. Tam and L.Y. Shen, Risk management for contractors in marine projects, Organ. Technol. Manag. Constr.: Int. J. 4 (2012), no. 1, 403–410.
[28] Y. Xu, J.F. Yeung, A.P. Chan, D.W. Chan, S.Q. Wang, and Y. Ke, Developing a risk assessment model for PPP projects in China—a fuzzy synthetic evaluation approach, Autom. Const. 19 (2010), no. 7, 929–943.
[29] B. Zahraei, M. Mirshekari, and A. Rouzbehani, Presentation of a fuzzy expert system-based risk analysis model for construction project management, Sharif J. Civil Engin., 32 (2016), no. 4.1, 61–70.
[30] P.X. Zou and R.Y. Sunindijo, Skills for managing safety risk, implementing safety task, and developing positive safety climate in construction project, Autom. Const. 34 (2013), 92–100.