[1] D. Agdas, D.J. Warne, J. Osio-Norgaard and F.J. Masters, Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems, J. Comput. Civil Eng. 32 (2018), no. 1, 04017072.
[2] C. Akkan, A Lagrangian heuristic for the discrete time–cost tradeoff problem for activity-on-arc project networks, Working Paper, Koc University, Istanbul, 1998.
[3] S.R. Alavipour and D. Arditi, Time-cost tradeoff analysis with minimized project financing cost, Automat. Construct. 98 (2019), 110–121.
[4] D.A. Ameen, A computer assisted PERT simulation, J. Syst. Manag. 38 (1987), no. 4, 6.
[5] T. Ann and S.S. Erenguc, The resource constrained project scheduling problem with multiple crashable modes: a heuristic procedure, Eur. J. Oper. Res. 107 (1998), no. 2, 250–259.
[6] P. Ballesteros-Perez, K.M. Elamrousy and M.C. Gonz´alez-Cruz, Non-linear time-cost trade-off models of activity crashing: application to construction scheduling and project compression with fast-tracking, Automat. Construct. 97 (2019), 229–240.
[7] S.A. Burns, L. Liu and C.W. Feng, The LP/IP hybrid method for construction time – cost trade off analysis, Construct. Manag. Econ. J. 14 (1994), no. 3, 265–276.
[8] D.K.H. Chau, W.T. Chan and K. Govindan, A time-cost trade-off model with resource consideration using genetic algorithm, Civil Eng. Syst. 14 (1997), 291–311.
[9] J. Chao-Guang, J. Zhuo-Shang, L.I.N. Yan, Z. Yuan-Min and H. Zhen-Dong, Research on the fully fuzzy time-cost trade-off based on genetic algorithms, J. Marine Sci. Applic. 4 (2005), no. 3, 18–23.
[10] A. Charnes, W.W. Cooper and E. Rhodes, Measuring the efficiency of decision making units, Eur. J. Oper. Res. 2 (1978), no. 6, 429–444.
[11] W. Cui, T. Ma and L. Caracoglia, Time-cost ”trade-off” analysis for wind-induced inhabitability of tall buildings equipped with tuned mass dampers, J. Wind Eng. Industr. Aerodyn. 207 (2020), p. 104394.
[12] S.E. Elmaghraby and J. Kamburowski, The analysis of activity network under generalized precedence relations, Manag. Sci. 38 (1992), no. 9, 1245–1263.
[13] C.W. Feng, L. Liu and S.A. Burns, Using genetic algorithms to solve construction time-cost trade-off problems, J. Comput. Civil Engin. 11 (1996), no. 3, 184–189.
[14] M. Gen and R. Cheng, Genetic algorithms and engineering design, John Wily and Sons, New York, 1997.
[15] M. Hapke, A. Jaszkiewicz and R. Slowinski, Fuzzy project scheduling system for software development, Fuzzy Sets Syst. 67 (1994), no. 1, 101–117.
[16] S.N. Hasyyati, I.A. Puspita and W. Tripiawan, Project acceleration of outside plant-fiber optic (OSP-FO) project in PT. XYZ using time cost trade off (TCTO) method by adding overtime hours, IOP Conf. Ser.: Mater. Sci. Eng. 852 (2020), no. 1, 012103.
[17] J. Jeunet and M.B. Orm, Optimizing temporary work and overtime in the time cost quality trade-off problem, Eur. J. Oper. Res. 284 (2020), no. 2, 743–761.
[18] F. Khosrowshahi and A.P. Kaka, The mathematics of cost-duration trade-off curves, CIB W92 Procure. Syst. Symp.-Inf. Commun. Construct. Procurement, 2000.
[19] S.S. Leu, A.T. Chen and C.H. Yang, A GA-based fuzzy optimal model for construction time–cost trade-off, Int. J. Project Manag. 19 (2001), no. 1, 47–58.
[20] H. Li, J.N. Cao and P.E.D. Love, Using machine learning and GA to solve time-cost trade-off problems, J. Construct. Eng. Manag. 125 (1999), no. 5, 347–353.
[21] S.X. Liu, M.G. Wang, L.X. Tang and Y.Y. Nie, Genetic algorithm for the discrete time/cost trade-off problem in project network, J. Northeastern Univ. Natural Sci. 21 (2000), no. 3, 257–259.
[22] H. Nikoomaram, F.H. Lotfi, J. Jassbi and M.R. Shahriari, A new mathematical model for time cost trade-off problem with budget limitation based on time value of money, Appl. Math. Sci. 4 (2010), no. 63, 3107–3119.
[23] R. Novianto, A. Bastari and A. Rahman, Time-cost trade-off analysis on Jetty construction project (case study: Indonesian navy Jetty construction project), STTAL Postgrad.Int. Conf., 4 (2020), no. 1.
[24] W. Peng and C. Wang, A multi-mode resource-constrained discrete time–cost tradeoff problem and its genetic algorithm based solution, Int. J. Project Manag. 27 (2009), 600–609.
[25] D. Robinson, A dynamic programming solution to cost-time trade-off for CPM, Manag. Sci. 22 (1965), 158–166.
[26] M. Saman, Crashing in PERT networks, M.Sc. Thesis, University of Jordan, Amman-Jordan, 1991.
[27] M. Shahriari, Multi-objective optimization of discrete time–cost tradeoff problem in project networks using nondominated sorting genetic algorithm, J. Industr. Eng. Int. 12 (2016), no. 2, 159–169.
[28] M. Shahriari, Soft computing based on a modified MCDM approach under intuitionistic fuzzy sets, Iran. J. Fuzzy Syste. 14 (2017), no. 1, 23–41.
[29] N. Siemens, A simple CPM time-cost tradeoff algorithm, Manag. Sci. 17 (1971), no. 6, B–354.
[30] V. To˘gan and M.A. Eirgash, Time-cost trade-off optimization of construction projects using teaching learning based optimization, KSCE J. Civil Eng. 23 (2019), no. 1, 10–20.
[31] R.M. Van Slyke, Monte Carlo methods and the PERT problem, Oper. Res. 33 (1963), 141–143.