[1] M.A. Abdelmegid, K.M. Shawki, and H. Abdel-Khalek, GA optimization model for solving tower crane location problem in construction sites, Alex. Eng. J. 54 (2015), no. 3, 519–526.
[2] M. Abunemeh, R.E. Meouch, I. Hijaze, A. Mebarki, and I. Shahrour, Optimal construction site layout based on risk spatial variability, Autom. Constr. 70 (2016), 167–177.
[3] A.M. Adrian, A. Utamima, and K.J. Wang, A comparative study of GA, PSO and ACO for solving construction site layout optimization, KSCE J. Civ. Eng. 19 (2015), no. 3, 520–527.
[4] M. Andayesh and F. Sadeghpour, A comparative study of different approaches for finding the shortest path on construction sites, Creative Const. Conf., 2014, pp. 33–41.
[5] K. El-Rayes and A. Khalafallah, Trade-off between safety and cost in planning construction site layouts, J. Const. Eng. Manag. 131 (2005), no. 11, 1186–1195.
[6] M.D. Fernandez, S. Quintana, N. Chavarr´ıa, and J.A. Ballesteros, Noise exposure of workers of the construction sector, Appl. Acoust. 70 (2009), 753–760.
[7] I. Fister, I. Fister Jr, X.S. Yang, and J. Brest, A comprehensive review of firefly algorithms, Swarm Evol. Comp. 13 (2013), 34–46.
[8] A. Ghadiri, D. Sedaghat Shayegan, and A. Amirkardoust, Multi-objective firefly optimization algorithm for construction site layout planning, Iran. J. Optim. 14 (2022), no. 4, 245–260.
[9] R. Gholizadeh, G.G. Amiri, and B. Mohebi, An alternative approach to a harmony search algorithm for a construction site layout problem, Can. J. Civ. Eng. 37 (2010), no. 12, 1560–1571.
[10] A.W.A. Hammad, A. Akbarnezhad, and D. Rey, A multi-objective mixed integer on- linear programming model for construction site layout planning to minimise noise pollution and transport costs, Autom. Const. 61 (2016), 73–85.
[11] C. Huang and C.K. Wong, Discretized cell modelling for optimal facility layout plans of unequal and irregular facilities, J. Const. Eng. Manag. 143 (2016), no. 1, p. 04016082.
[12] F. Karray, E. Zaneldin, T. Hegazy, and A.H.M. Shabeeb, Tools of soft computing as applied to the problem of facilities layout planning, IEEE Trans. Fuzzy Syst. 8 (2000), no. 4, 367–379.
[13] A. Kaveh and M. Rastegar Moghaddam, A hybrid WOA-CBO algorithm for construction site layout planning problem, Sci. Iran. 25 (2018), no. 3, 1094–1104.
[14] K.C. Lam, C.M. Tang, and W.C. Lee, Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects, Const. Manag. Econ. 23 (2005), no. 2, 127–145.
[15] L.C. Lien and M.Y. Cheng, Particle bee algorithm for tower crane layout with material quantity supply and demand optimization, Autom. Const. 45 (2014), 25–32.
[16] A.R. Mehrabian and C. Lucas, A novel numerical from weed colonization, Ecol. Inf. 1 (2006), 366–355.
[17] Ministry of Housing and Urban-Rural Development of the People’s Republic of China (MOHURD), Statistical analysis of construction industry development (2016), Beijing, China, http://www.mohurd.gov.cn/xytj/tjzljsxytjgb/xjxxqt/w02017052321346623070743428.pdf, 2017.
[18] S.A. Mirjalili and A. Lewis, The whale optimization algorithm, Adv. Eng. Softw. 95 (2016), 51–67.
[19] E. Moradi and M. Bidkhori, Single facility location problem, R. Zanjirani Farahani and M. Hekmatfar (eds), Facility location, Contributions to Management Science, Physica, Heidelberg, 2009, pp. 37–68.
[20] X. Ning and K.C. Lam, Cost-safety trade-off in unequal-area construction site layout planning, Autom. Const. 32 (2013), 96–103.
[21] X. Ning, K.C. Lam, and M.C.K. Lam, Dynamic construction site layout planning using max-min ant system, Autom. Constr. 19 (2010), 55–65.
[22] X. Ning, J. Qi, C. Wu, and W. Wang, A tri-objective ant colony optimization-based model for planning safe construction site layout, Aut. Const. 89 (2018), 1–12.
[23] F.G. Paes, A.A. Pessoa, and T. Vidal, A hybrid genetic algorithm with decomposition phases for the unequal area facility layout problem, Eur. J. Oper. Res. 256 (2017), 742–756.
[24] A.A. Saberi and D. Sedaghat Shayegan, Optimization of Haraz dam reservoir operation using CBO metaheuristic algorithm, Int. J. Optim. Civil Eng. 11 (2021), no. 4, 581–592.
[25] A. Safari, An ant-colony optimization clustering model for cellular automata routing in wireless sensor networks, Iran. J. Optim. 12 (2020), no. 2, 139–147.
[26] D. Sedaghat Shayegan, Optimum cost design of reinforced concrete slabs using a metaheuristic algorithm, Int. J. Optim. Civil Eng. 12 (2022), no. 4, 545–555.
[27] D. Sedaghat Shayegan, A. Lork, and A.H. Hashemi, Mouth brooding fish algorithm for cost optimization of reinforced concrete one-way ribbed slabs, Int. J. Optim. Civil Eng. 9 (2019), no. 3, 411–422.
[28] D. Sedaghat Shayegan, A. Lork, and A.H. Hashemi, Optimum cost design of reinforced concrete slabs using Mouth Brooding Fish (MBF) algorithm, J. Appl. Eng. Sci. 10 (2020), no. 23, 95–100.
[29] D. Sedaghat Shayegan, A. Lork, and A.H. Hashemi, The assessment of fragility curves of the Application of diagonal and chevron viscous damper in steel structures using a metaheuristic algorithm for modification of ground motions, J. Struct. Const. Eng. 7 (2021), no. 4, 100–115.
[30] S.S. Shahebrahimi, A. Lork, and D. Sedaghat Shayegan, Knowledge management to investigate the failure factors in managing of gas and oil industry transmission lines projects, Iran Univ. Sci. Technol. 12 (2022), no. 2, 215–233.
[31] S.P. Singh and V.K. Singh, An improved heuristic approach for multi-objective facility layout problem, Eur. J. Oper. Res. 48 (2010), no. 4, 1171–1194.
[32] X. Song, F. Pena-Mora, C.H. Shen, Z. Zhang, and J. Xu, Modelling the effect of multi-stakeholder interactions on construction site layout planning using agent-based decentralized optimization, Autom. Const. 107 (2019), 1–20.
[33] C.M. Tam and K.L. Tong, GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction, Const. Manag. Econ. 21 (2003), 257–266.
[34] A.L.E. Teo, G. Ofori, I.K. Tjandra, and H. Kim, Design for safety: Theoretical framework of the safety aspect of BIM system to determine the safety index, Const. Econ. Build. 16 (2016), no. 4, 1–18.
[35] M. Weinstein and J.A. Gambatese, Can design improve construction safety? Assessing the impact of a collaborative safety-in-design process, J. Const. Eng. Manag. 131 (2005), no. 10, 1125–1134.
[36] R.D. Woodson, Construction Hazardous Materials Compliance Guide: Lead Detection, Abatement and Inspection Procedures, Butterworth-Heinemann, Elsevier, 2012.
[37] J.P. Xu and Z.M. Li, Multi-objective dynamic construction site layout planning in fuzzy random environment, Autom. Const. 27 (2012), 155–169.
[38] X.-S. Yang, Multiobjective firefly algorithm for continuous optimization, Engin. Comput. 29 (2013), 175–184.
[39] P. Zhang, F.C. Harris, P.O. Olomolaiye, and G.D. Holt, Location optimization for a group of tower cranes, J. Constr. Eng. Manag. 125 (1999), no. 2, 115–122.